Create a Reinspection

Prev Next

The Community Development system links multiple inspections. This allows tracking the status of a "failed" inspection. It tracks the failure through as many authorized inspections as needed. This continues until the problem is fixed. This process is used in the permitting, violation, complaint, and fire and safety modules.

By default, the system only shows the re-inspect link for inspections that have a "failed" status. However, a setting can be turned on. This allows the "re-inspect" option for inspections that have a "pass" status. This is mostly used for large commercial project inspections. For example, you might need to inspect only parts of an inspection type, like framing. If local rules allow, the contractor can request inspections on parts of the work, such as the first 100 feet of framing. This lets them continue other building steps, even while framing work is still going on in other parts of the building.

When a staff member clicks the "re-inspect" link, the system creates a new inspection record. This new record is directly linked to the failed inspection. The system also brings over comments, checklist items, and notes from the first inspection. The re-inspection becomes the main record. The main record cannot be changed until the re-inspection is completed. It is also not possible to delete the original inspection record. This applies if it is attached to a re-inspection.

Instructions

  1. Sign in to your site

  2. Navigate to Permitting System, then click List. Find and click on the Permit NumberNavigation showing a list of permits with permit number and location details in the permitting system.

  3. Click Edit (Permitting & Project Systems only) The permit details page shows options to edit and print the menu for a specific parcel.

  4. Navigate to the Inspections tab. Select the applicable inspection, and click Re-Inspect Permit inspection details showing status, inspector, and actions for the inspection number. The re-inspect link is highlighted.

  5. The system keeps the original inspection number. It adds the letter "R" to the start of the number. For each re-inspection, it increases the record number by 1Inspection details, including the inspection number, type, and status, for plumbing inspections.

  6. Schedule the inspection as required Calendar interface showing inspection start and end times for the selected inspector.

    • Calendar: Select the calendar link to choose the date of the re-inspection

    • Start At: From the dropdown menu, select the start time for the re-inspection

    • Inspection End At: From the dropdown menu, select the time the inspection was completed

  7. Once the re-inspection has been completed, change the Status of the inspection from the drodown menuInspection details showing type as Final Plumbing and status marked as Pass.

  8. Click Save InspectionAn interface showing options to save codes and inspections in a software application.

  9. Print any letters/forms of the inspection as required Buttons for saving, cloning, canceling, and printing a permit are displayed. The print menu button is highlighted.