This article will show you how to adjust the schedule of a report.
Instructions
Navigate to the Reports tab
.png?sv=2026-02-06&spr=https&st=2026-08-24T00%3A50%3A04Z&se=2026-08-24T01%3A01%3A04Z&sr=c&sp=r&sig=p7KWglOYm4rm6f57zQUINHi7AxgcAd7vC6IJjURV2%2Fw%3D)
Click Scheduled Reports in the right-hand corner

Select Actions, Modify Schedule next to the desired report

Make adjustments as needed

Start Date: Select the date and time the report should begin running
End Date: Choose the end date and time for the scheduled report
Auto Date: Select the desired auto date from the drop-down
Note:
Auto Dates determine the date range used, relative to the time the report is run.
Email Body: Choose if the email body is included or not
Email Attachment: Choose whether or not to include an email attachment
Schedule: Select if the report is on a Daily, Monthly, or Weekly schedule
Click Save