Modify a Report Schedule

Prev Next

This article will show you how to adjust the schedule of a report.

Instructions

  1. Navigate to the Reports tab Reports Tab in the left navigation menu.

  2. Click Scheduled Reports in the right-hand corner Scheduled reports button in the top right of the reports page.

  3. Select Actions, Modify Schedule next to the desired report modify schedule in the actions dropdown.

  4. Make adjustments as needed Modify Schedule for Report fields.

    • Start Date: Select the date and time the report should begin running

    • End Date: Choose the end date and time for the scheduled report

    • Auto Date: Select the desired auto date from the drop-down

      Note:

      Auto Dates determine the date range used, relative to the time the report is run.

    • Email Body: Choose if the email body is included or not

    • Email Attachment: Choose whether or not to include an email attachment

    • Schedule: Select if the report is on a Daily, Monthly, or Weekly schedule

  5. Click SaveSave button on the modify schedule popup.