Inspections are created at the record level in Community Development. The inspection system is similar in design throughout all modules.
The inspection feature links directly to the Scheduling Tool system and to the mobile inspection and field operation processes. Users can manually enter inspection start dates and times and select inspectors. However, a complete calendar system provides an easy way to track availability, avoid double booking, and present an easy way to manage the entire inspection scheduling process.
Important Notes
Keep in mind that if you are or will be using the citizen portal, staff should be using the scheduling system. Not using this component reduces the power and effectiveness of the system.
The inspection status should not be changed from open until the inspection is complete. If field inspectors do not have system access, office staff can manage inspections for all field staff through the calendar.
Instructions
Sign in to your site
Click the Permitting System menu:

Click List:
.png?sv=2026-02-06&spr=https&st=2026-09-21T11%3A54%3A28Z&se=2026-09-21T12%3A09%3A28Z&sr=c&sp=r&sig=Zj9QXh2xLM8qzlziBQBFno%2F793VnpWtk9LaEMqa2F%2Fc%3D)
Search for and select a record from the list:

Click Edit (Permitting & Project Systems only):

Click the Inspections tab:

Click Add New to create an inspection:

An Inspection Details window will open, and the record is assigned the next available Inspection # (Number)

Choose the Inspection Type from the drop-down list, which will populate with the available options for the module

Note
The Community Development system can automatically link specific inspection types. This happens based on the chosen permit type and its use. This automatic process limits the inspection types in the drop-down list. Only types linked to the permit or project type and use will appear. Contact Support if you would like to discuss setting up this advanced feature.
Use one of the following options to schedule the inspection:
Schedule an inspection using the calendar: This method is used when the inspection is being scheduled in advance
Click Calendar

The calendar will open in a pop-up window. This window lists all inspectors for that location. It also shows inspections already scheduled for the current date

Note
For details on all fields and processes, see the Scheduling Manager section.
Use the Jump to date or the arrows to move to a specific date to check the inspector’s availability

Once the correct date and time are located, simply click on a date box

The system will populate the start date and time selected inside the inspection record

Or, schedule an inspection without using the calendar system
Choose an Inspector from the drop-down (they must have an account in the system)

Select the Start At date for the inspection and enter the time you want to allow for the inspection

Note
The system defaults to 1 hour from the start time. This can also be the time that was set during implementation. The end date and time are very important for final inspections. This is because that date is tracked in all reports. It is also tracked in some placards.
If an inspection is scheduled in advance on the calendar, leave the status field as open. If the inspection has already been completed, change the status field as needed.

Note
If an inspection fails and is then saved, the system will ask a question. It will ask if a violation record should be created based on the failure. If you say yes, the system will take you to a new violation record for you to complete the required process.
Fill out additional inspection fields, as needed
Scroll down and click Save Inspection
.png?sv=2026-02-06&spr=https&st=2026-09-21T11%3A54%3A28Z&se=2026-09-21T12%3A09%3A28Z&sr=c&sp=r&sig=Zj9QXh2xLM8qzlziBQBFno%2F793VnpWtk9LaEMqa2F%2Fc%3D)
The inspection will be added to the inspection system. If enabled, an email will be sent to the inspector. The inspection will also be added to the inspector's calendar. It will also appear as an action item in the dashboard.
Inspection Details Fields

Inspection # (Number): Will automatically populate with the next available number in the system.
Type: The drop-down list will populate with the available inspection types for the module.
Status: If an inspection is scheduled in advance on the calendar, leave the status field as "open". If the inspection has already been completed, change the status field as needed. If an inspection fails and is then saved, the system will ask a question. It will ask if a violation record should be created based on the failure. If the user confirms "yes", the system will take them to a new violation record. There, they can complete the required process.
Inspector: Choose an inspector from the drop-down menu. This field will automatically fill if the calendar is used for scheduling.
Signatory Title: This is the signature and title that will appear on the inspection. Use this field when the default title for the person signing needs to be changed.
Secondary Inspector: Select a secondary inspector for the record, if applicable.
Start and End At: Select the start-at date for the inspection. Then, enter the time needed for the inspection. Do this if the calendar is not used for scheduling. The system defaults to one hour from the start time. This can also be the time that was set during implementation. The end date and time are very important for final inspections. This is because that date is tracked in all reports. It is also tracked in some placards.
Notify Flag: Check to select a group to notify
Requestor Email: If applicable, enter the email address for the requestor of the inspection
Canned Response: Choose to use a canned response for notifications
Contractor Name: If applicable, select the name of the contractor from the list
Number of Units: Enter the number of units that are included in the inspection
Status Value: Check if you are using electronic inspection checklists. These can be attached to an inspection record. By checking this value, the system will automatically fail the inspection. This occurs as you go through the electronic checklist items, customized for you. It happens if you check any of the checklist items as a failure. This also happens once you save the checklist and the record. The failure is based on the failed checklist item. If you want to use checklists in the system but do not want the system to fail the inspection based on the checklist item results automatically, leave the box unchecked.
Final Flag: The final flag checkbox is very important. It should be checked only if the inspection record is the last one. This means it is the final inspection for the current record. This flag controls several automated actions inside the system. One action is tracking the date and time of the final inspection. This date may be needed on some certificates of occupancy or similar documents. It may also be needed on specific inspection reports. The flag also controls whether the system shows a warning message. This message appears if a certificate is created before the final inspection is finished.
Comments: Enter your inspection results or comments. These comments will appear in inspection results letters and similar forms/letters exactly as you type them.
Virtual Inspection: Check to schedule a virtual inspection