Mark a Condition as Complete

Prev Next

  1. Sign in to your site

  2. Click the Projects System or Permitting System menu:Main dashboard menu highlighting the Projects System option for navigation.

  3. Click Search:
    Navigation menu displaying options like Search, Meetings, and Project Inspections with Search highlighted.

  4. Select a record:
    The Projects interface with a Project Number highlighted.

  5. Click the Conditions tab:
    The Edit project interface with the Conditions tab highlighted.

  6. Click the Edit URL:Editing project details with conditions imposed and actions available for modification. The edit button is highlighted.

  7. Check the box that the condition has been met:A highlighted checkbox to confirm the condition has been met, with instructions for linking project variances.

  8. Click Save:Form section for condition details with instructions for adding variances and saving changes. The save button is highlighted.

Supporting Articles