Event Spray is a way to apply the same event across multiple assets simultaneously.
Instructions
Click Query Actions

Click Event Spray

Select an Event Type

Note:
The Event Types available change based on the asset class selected.
Complete the Event Type’s fields

Note:
The input fields available vary based on the Event Type selected.
Identification Details:
Name: Enter a name for the event, or leave blank to be auto-incremented.
Maintenance Type: Select the appropriate type from the dropdown list.
Crew: Choose the assigned crew.
Assigned To: Assign the event to an individual or team.
Status: This field defaults to Pending (the default can be changed).
Priority: Set the event priority (such as 3).
Supervisor: Assign a supervisor if needed.
Work Order: Enter a related work order, if applicable.
Scheduling Information:
Planned Date: Select the intended date for the spray event (like 05/14/2025).
Actual Date: Leave blank unless the event has occurred.
Start Time/End Time: Optional; enter times if needed.
Duration: Select how long the event is expected to take in minutes.
Miscellaneous (Optional)
Note: Enter any relevant information or comments.
Enter Resources (Optional)
Click New under Time to add:
Date
User
Duration
Wage Code
Note
Click New under Material to add:
Component
Part
Unit Cost
Quantity
Cost
Note
Click Next

Click Submit
