This article will show you how to add a schedule to a session. The schedule feature allows you to configure information such as the date and time of the session, how often the program occurs, and if you wish to reserve a facility for that time frame.
Instructions
Navigate to Activities, then to Activity List
Expand an Activity
Select Edit Session (pencil icon) next to the desired session or Create a New Session
Navigate to the Schedule tab
Click Add Schedule
Fill in the fields
Facility: Select a facility from the list
Start/End Dates and Times: Indicate when the session will begin/end
Note:
If the Start and End Dates are set as the same day and the End Time is set before the Start Time, the schedule will roll over to the next day. (Example: If the Start Date/Time is 1/18/2022 at 8 a.m. and the End Date/Time is 1/18/2022 at 6 a.m., the system will set the schedule as 8 a.m. on 1/18/2022 to 6 a.m. on 1/19/2022.)
Repeat: Indicate the interval of time for which the session will repeat
Day Select: Select the day(s) that the session will occur on
Note:
This option is only available for Weekly repeat schedules.
Relative Date: Select the Relative Date option to indicate that the session will repeat based on the week and weekday of the Start Date
Reserve Facility: Check to reserve the facility with the session schedule
Conflict Override: Click to override scheduling conflicts
Add Schedule: Add additional schedules as needed
Click Save Session